学开网

国开网100万+专项题库

使用积分解锁答案,让你的形成性考核不再困难。

访
未登录
当前积分 -
单选题
__5__
  • T
  • F
  • A

  • B

  • C

  • D

  • E

单选题

I bought a new car last month, but I ______ my old car yet.

  • did not sell

  • have not sold

  • had not sold

完形填空

二、阅读理解

阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)

Road Closure Procedures in Sydney

  To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

  Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.

  Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

  If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

 

操作提示:通过题干后的下拉框选择题目的正确答案。

As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________.  1

 A. weekdays

 B. Saturdays

 C. Sundays

2. If you want a road closed to traffic, you must complete your applications and send them to the relevant committee at least__________ before the scheduled date. 2

 A. a week

 B. 30 days

 C. two months

3. Partial of full road closures are decided by _________. 3

 A. the requirements from applicants

 B. the traffic flow

 C. the road conditions

4. Which is NOT the condition for partial road closures according to the passage? 4

 A. In light traffic areas.

 B. On work days.

 C. There will be at least 1 lane for traffic during the work.

5. Which is the best title of this passage? 5

 A. Road Closure Procedures in Sydney

 B. Road Conditions in Sydney

 C. Road Management in Sydney

__1__
  • A
  • B
  • C
__2__
  • A
  • B
  • C
__3__
  • A
  • B
  • C
__4__
  • D
  • E
  • F
  • G
  • H
  • A
  • B
  • C
__5__
  • A
  • B
  • C
单选题
__1__
  • A
  • B
  • C
单选题
__2__
  • A
  • B
  • C
单选题
__3__
  • A
  • B
  • C
单选题
__4__
  • D
  • E
  • F
  • G
  • H
  • A
  • B
  • C
单选题
__5__
  • A
  • B
  • C
单选题

从基于系统和利益相关者的监督中团队可以得到各种信息,这些信息包括( )。

①进度表的完成程度;

②达到质量标准的情况;

③顾客和利益相关者的满意度;

④团队成员的生活改善情况。

  • ①③④

  • ②③④

  • ①②④

  • ①②③

单选题

常见的绩效评估的标准有四种,其中“团队成员哪些方面的能力得到了提高?”属于绩效评估的( )标准。

  • 成果

  • 学习

  • 时间

  • 凝聚力